Preparations are now underway to export crude oil after the lifting of force majeure on terminals and oil fields.
On July 20, a tanker is scheduled to arrive at the terminal of Zueitina to load one million barrels of Abutifal crude, and a tanker will arrive at Sedra terminal scheduled during the period from July 19 to 20. In addition, two tankers will arrive at Ras Lanuf terminal on 20/21 on July.
There is also a tanker is scheduled to load 600,000 barrels of Brega crude during this period.
These arrangements have been made in order to resume production’s operations.